{"id":10297,"date":"2021-05-28T16:07:10","date_gmt":"2021-05-28T08:07:10","guid":{"rendered":"https:\/\/www.lada.gov.my\/?p=10297"},"modified":"2021-06-03T13:03:14","modified_gmt":"2021-06-03T05:03:14","slug":"site-visit-session-by-tuan-nasaruddin-abdul-muttalib-lada-chief-executive-officer","status":"publish","type":"post","link":"https:\/\/www.lada.gov.my\/en\/site-visit-session-by-tuan-nasaruddin-abdul-muttalib-lada-chief-executive-officer\/","title":{"rendered":"SITE VISIT SESSION BY TUAN NASARUDDIN ABDUL MUTTALIB, LADA CHIEF EXECUTIVE OFFICER"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last\" style=\"--awb-bg-size:cover;--awb-margin-bottom:0px;\"><div class=\"fusion-column-wrapper fusion-flex-column-wrapper-legacy\"><div class=\"fusion-text fusion-text-1\"><p>On 21st to 25th May 2021, LADA CEO Tuan Nasaruddin Abdul Mutalib accompanied by a few officers of the agency had conducted a site visit to some locations under LADA\u2019s administration to monitor the progress of several on-going projects. The following are some locations involved and the respective follow-up actions to be implemented: <\/p>\n<p>1. Geopark Discovery Centre at Kampung Kilim<br \/>\nAction: Repairing of defects by contractor involved should be executed as soon as possible through coordination with Public Works Department (JKR).<\/p>\n<p>2. MIEC Hall Upgrading Project at Padang Matsirat<br \/>\nAction: Matters regarding consultant appointment and work plan timeline shall be given careful attention to ensure designing works can commence immediately. <\/p>\n<p>3. Visit to project by Sentoria Group Berhad<br \/>\nAction: Identification of follow-up actions to settle a few raised issues. <\/p>\n<p>4. Kota Mahsuri Auditorium Construction Project<br \/>\nAction: Preparation of recovery plan by contractor involved as well as supplement of workforce at construction site will be dealt with at once and monitored by JKR. <\/p>\n<p>5. Bridge Construction Project at Sungai Perangin<br \/>\nAction: Contractor is required to submit project recovery plan as well as coordinate proximately the utilities transferring work with JKR.<\/p>\n<p>6. Lavatory Construction Project at Tasik Dayang Bunting<br \/>\nAction: Some improvement suggestions had been presented to contractor engaged which include supplement of workforce at project site and presentation of project recovery plan.<\/p>\n<p>7. Kuah Tourism Jetty Upgrading Project<br \/>\nAction: LADA had proposed some improvements to be implemented such as identification of comprehensive management strategies along with prompt consultant appointment. <\/p>\n<p>Such sessions held will be continued from time to time to ensure all LADA projects can smoothly proceed.<\/p>\n<\/div><div class=\"fusion-sep-clear\"><\/div><div class=\"fusion-separator fusion-full-width-sep\" style=\"margin-left: auto;margin-right: auto;margin-bottom:40px;width:100%;\"><\/div><div class=\"fusion-sep-clear\"><\/div><div class=\"awb-gallery-wrapper awb-gallery-wrapper-1 button-span-no\"><div style=\"margin:-1px;--awb-bordersize:0px;\" class=\"fusion-gallery fusion-gallery-container fusion-grid-3 fusion-columns-total-5 fusion-gallery-layout-grid fusion-gallery-1\"><div style=\"padding:1px;\" class=\"fusion-grid-column fusion-gallery-column fusion-gallery-column-3 hover-type-zoomin\"><div class=\"fusion-gallery-image\"><a href=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/5-7.jpg\" rel=\"noreferrer\" data-rel=\"iLightbox[gallery_image_1]\" class=\"fusion-lightbox\" target=\"_self\"><img decoding=\"async\" src=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/5-7.jpg\" width=\"900\" height=\"600\" alt=\"\" title=\"5\" aria-label=\"5\" class=\"img-responsive wp-image-10306\" srcset=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/5-7-200x133.jpg 200w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/5-7-400x267.jpg 400w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/5-7-600x400.jpg 600w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/5-7-800x533.jpg 800w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/5-7.jpg 900w\" sizes=\"(min-width: 2200px) 100vw, (min-width: 824px) 389px, (min-width: 732px) 584px, (min-width: 640px) 732px, \" \/><\/a><\/div><\/div><div style=\"padding:1px;\" class=\"fusion-grid-column fusion-gallery-column fusion-gallery-column-3 hover-type-zoomin\"><div class=\"fusion-gallery-image\"><a href=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/4-7.jpg\" rel=\"noreferrer\" data-rel=\"iLightbox[gallery_image_1]\" class=\"fusion-lightbox\" target=\"_self\"><img decoding=\"async\" src=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/4-7.jpg\" width=\"900\" height=\"600\" alt=\"\" title=\"4\" aria-label=\"4\" class=\"img-responsive wp-image-10304\" srcset=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/4-7-200x133.jpg 200w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/4-7-400x267.jpg 400w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/4-7-600x400.jpg 600w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/4-7-800x533.jpg 800w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/4-7.jpg 900w\" sizes=\"(min-width: 2200px) 100vw, (min-width: 824px) 389px, (min-width: 732px) 584px, (min-width: 640px) 732px, \" \/><\/a><\/div><\/div><div style=\"padding:1px;\" class=\"fusion-grid-column fusion-gallery-column fusion-gallery-column-3 hover-type-zoomin\"><div class=\"fusion-gallery-image\"><a href=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/3-8.jpg\" rel=\"noreferrer\" data-rel=\"iLightbox[gallery_image_1]\" class=\"fusion-lightbox\" target=\"_self\"><img decoding=\"async\" src=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/3-8.jpg\" width=\"900\" height=\"600\" alt=\"\" title=\"3\" aria-label=\"3\" class=\"img-responsive wp-image-10302\" srcset=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/3-8-200x133.jpg 200w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/3-8-400x267.jpg 400w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/3-8-600x400.jpg 600w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/3-8-800x533.jpg 800w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/3-8.jpg 900w\" sizes=\"(min-width: 2200px) 100vw, (min-width: 824px) 389px, (min-width: 732px) 584px, (min-width: 640px) 732px, \" \/><\/a><\/div><\/div><div class=\"clearfix\"><\/div><div style=\"padding:1px;\" class=\"fusion-grid-column fusion-gallery-column fusion-gallery-column-3 hover-type-zoomin\"><div class=\"fusion-gallery-image\"><a href=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/2-9.jpg\" rel=\"noreferrer\" data-rel=\"iLightbox[gallery_image_1]\" class=\"fusion-lightbox\" target=\"_self\"><img decoding=\"async\" src=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/2-9.jpg\" width=\"900\" height=\"600\" alt=\"\" title=\"2\" aria-label=\"2\" class=\"img-responsive wp-image-10300\" srcset=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/2-9-200x133.jpg 200w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/2-9-400x267.jpg 400w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/2-9-600x400.jpg 600w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/2-9-800x533.jpg 800w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/2-9.jpg 900w\" sizes=\"(min-width: 2200px) 100vw, (min-width: 824px) 389px, (min-width: 732px) 584px, (min-width: 640px) 732px, \" \/><\/a><\/div><\/div><div style=\"padding:1px;\" class=\"fusion-grid-column fusion-gallery-column fusion-gallery-column-3 hover-type-zoomin\"><div class=\"fusion-gallery-image\"><a href=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/1-8.jpg\" rel=\"noreferrer\" data-rel=\"iLightbox[gallery_image_1]\" class=\"fusion-lightbox\" target=\"_self\"><img decoding=\"async\" src=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/1-8.jpg\" width=\"900\" height=\"600\" alt=\"\" title=\"1\" aria-label=\"1\" class=\"img-responsive wp-image-10298\" srcset=\"https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/1-8-200x133.jpg 200w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/1-8-400x267.jpg 400w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/1-8-600x400.jpg 600w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/1-8-800x533.jpg 800w, https:\/\/www.lada.gov.my\/wp-content\/uploads\/2021\/05\/1-8.jpg 900w\" sizes=\"(min-width: 2200px) 100vw, (min-width: 824px) 389px, (min-width: 732px) 584px, (min-width: 640px) 732px, \" \/><\/a><\/div><\/div><\/div><\/div><div class=\"fusion-sep-clear\"><\/div><div class=\"fusion-separator fusion-full-width-sep\" style=\"margin-left: auto;margin-right: auto;margin-top:50px;width:100%;\"><div class=\"fusion-separator-border sep-single sep-dotted\" style=\"--awb-height:20px;--awb-amount:20px;border-color:#e0dede;border-top-width:1px;\"><\/div><\/div><div class=\"fusion-sep-clear\"><\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":10309,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[114,120],"tags":[],"class_list":["post-10297","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-lada-en","category-latest"],"_links":{"self":[{"href":"https:\/\/www.lada.gov.my\/en\/wp-json\/wp\/v2\/posts\/10297","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lada.gov.my\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.lada.gov.my\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.lada.gov.my\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lada.gov.my\/en\/wp-json\/wp\/v2\/comments?post=10297"}],"version-history":[{"count":0,"href":"https:\/\/www.lada.gov.my\/en\/wp-json\/wp\/v2\/posts\/10297\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lada.gov.my\/en\/wp-json\/wp\/v2\/media\/10309"}],"wp:attachment":[{"href":"https:\/\/www.lada.gov.my\/en\/wp-json\/wp\/v2\/media?parent=10297"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.lada.gov.my\/en\/wp-json\/wp\/v2\/categories?post=10297"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.lada.gov.my\/en\/wp-json\/wp\/v2\/tags?post=10297"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}